Applications · examples
Start with the measurement question.
Discuss a measurement pilot through six example scenes.
Six scenes
What to measure, what to examine, where to start
These six examples show what sensors could measure and what the data could reveal at each type of site. We will replace examples with real sites after the first real pilot is connected.
Main intake · minimum night flow
Building water
- Measure
- Main intake flow at night
- What it shows
- Continuous night-time flow may indicate a leak
- First step
- One sensor on the main intake
A site like this? Tell us about yours →
Supply · return · pump off at 23:00
Chilled water · HVAC
- Measure
- Loop flow and pump starts and stops
- What it shows
- Flow outside the schedule calls for valve or pump checks
- First step
- One sensor each on supply and return
A site like this? Tell us about yours →
Three cooling branches · one sensor each
Data-centre cooling
- Measure
- Flow in each cooling branch
- What it shows
- Uneven branch flows call for review
- First step
- Select one branch first
A site like this? Tell us about yours →
Inlet · outlet · water balance
Industrial process water
- Measure
- Inlet and outlet flow
- What it shows
- A water-balance gap indicates possible waste or leakage
- First step
- One sensor each at inlet and outlet
A site like this? Tell us about yours →
Zone totals against the main meter
Campus sub-metering
- Measure
- Water use by zone and at the main intake
- What it shows
- A gap between zone totals and the main meter narrows the search
- First step
- One sensor per zone, compared with the main meter
A site like this? Tell us about yours →
No shut-off · no cutting · minimum night flow
Ageing pipe networks
- Measure
- Night-time pipe flow measured without stopping the water
- What it shows
- Minimum night flow can help estimate leakage
- First step
- Select a pipe section and measure for a week
A site like this? Tell us about yours →
Work with us
Three ways to begin a discussion
-
Site operators and facility teams
Describe your pipe network and the measurement question. We can discuss a pilot scope and acceptance method.
Tell us about your site -
System integrators
Discuss site connections and platform requirements. Identify the conditions to check before a pilot.
Discuss integration -
Device makers and technical partners
Discuss sensor interfaces and measurement validation. Share the resources and conditions relevant to cooperation.
Discuss cooperation
Current boundaries
What we do not do at this stage
- We do not sell sensors yet: the first kind is in development. Any device used in a pilot is quoted, contracted and shipped by its maker.
- We do not quote or sign on anyone's behalf.
- We do not sell anyone's data. Owners decide what is public and can withdraw.